We spent October mostly resting after a rough September. Ron felt good enough to do a few jobs. Changing the flap on the outside doggie door, a 15-min job turned into an all-day ordeal, replacing rotten wood. Chris got a few of the can lights and a/c vent covers installed. We cleaned out the garage, got digital gauges installed in the ’57 and a new engine cover that will be painted same color as the body.